Limitations:
- Applications at ambient temperatures below 4°C is not recommended.
Pre-treatment of Substrate:
Concrete Surfaces:
The surface or holes must be clean, dry, free from grease or oil, etc. Laitance and loose particles must be removed by either sandblasting or mechanical grinding. Holes must be cleaned using dry and oil free compressed air.
Steel Surfaces:
All steel surfaces to be bonded with CHEM-DOWEL 2 must be clean, dry, free from rust, oil, grease, etc. Shot blasting to Swedish Standard SA 2 ½ is preferable to achieve a white metal finish prior to application.
Holes for Setting Dowels:
Holes Dimensions: The annular space between anchor rod, dowel, rebar, etc., and hole should be as small as possible 3-5mm yet still provide ease of placement.
Depth of Embedment Guidelines:
- When substrate has compressive strength of 21 N/mm² and greater or the anchor bolts are threaded, the minimum depth is 10 times the bolt diameter.
- For grouting smooth bolts or into substrates with less than 21 N/mm², the minimum depth of embedment is at least 15 times the bolt diameter
Drilling:
- Dry Drilling: Vacuum or blow out the dust from hole using oil free compressed air or blow pump
- Wet Drilling: Wash out hole with clean water to remove residue of drilling slurry. Remove free standing water. It is preferable to allow the hole to complete dry.
- Bolts, dowels, rebars must be clean de-rust, dry and de-grease.
Mixing of CHEM-DOWEL 2: Stir each component separately. Mix one part A and one part B by volume into a clean mixing container. Mix the epoxy with a slow speed electric drill with a mixing paddle attachment. Carefully scrape the sides and bottom of the pail during mixing. Blend for 3 minutes.
Note:Large batches of epoxy will cure much faster than small batches. Mixed epoxy will cure much faster in hot weather than in cold weather.
Application: Application can be made by mechanical, pneumatic dosage equipment, caulking guns or by hand. Force the mixture into drilled hole, then insert the steel bar with a twisting motion to ensure intimate contact and a good bond without air entrapment
Lightly tap the anchor, dowel to ensure complete embedment. Wipe off any excess material from the surface and finish to a neat smooth surface.
Bonding of any similar/dissimilar material: ensure both surfaces to bond is clean and free of dust, oil, grease, etc. Roughen up the surfaces for good mechanical
keying. Apply in thin layer CHEM-DOWEL 2 on both surfaces. Pull them together and hold into position undisturbed for 6 – 8 hrs.
Curing: Initial setting is minimum 8 hours. Full cure in 3 days.
Cleaning: Remove uncured CHEM-DOWEL 2 from tools and equipment with a suitable solvent such as Xylene or Toluene immediately after use. Cured material may only be removed mechanically.